Ferrari F430 Install Episode 4 – Building Vapor Barriers, Sound Deadening and Installing Crossovers

Ferrari F430 Install Episode 4 – Building Vapor Barriers, Sound Deadening and Installing Crossovers

In episode four of our Ferrari F430 Install, we build new vapor barriers, apply dynamat to sound deaden the doors and mount the crossovers

Music by Lakey Inspired: https://soundcloud.com/lakeyinspired

Video Chapters:
0:27 Previously
1:00 Make New Vapor Barriers
3:00 Adhering Factory Pieces to New Vapor Barriers
4:20 Will The new Vapor Barriers Fit!?
5:30 Cutting Prep Holes for Installation
8:30 Adding Strip Calk to Barriers for Mounting
9:00 Applying Dynamat to Doors for Sound Deadening
11:00 Installing the Vapor Barriers
12:10 Testing Crossover Placement
12:30 Building Brackets to Mount the Crossovers
17:00 Installing the Crossovers
20:00 Running and Connecting the Power, Speaker and Tweeter Wires
23:00 Finish Corssovers
24:07 Next Episode!

Stay tuned next week for Episode 5!
Visit www.QualityMobileVideo.com for all of your car audio and video needs!

Instagram: @qualitymobilevideo
Twitter: @qualitymobilevi
Facebook: https://www.facebook.com/qualitymobilevideocom-292229920826823

1,098
Like
Save


Comments

P.Formula Powers says:

100% professional!
May I ask what your labor rates on installation are?

E Funky Man says:

I'm really feeling that beat starting at the 5:41 mark..

DJ Brandon says:

Ok look Mr.Jim I think all you want is views 🙁 and you want people to come back for more!
Well it's working!!!!
I want the BOOOOOMMM BOOOOMMM!!!

DetrellOfATL says:

Good job, show detailed work.

Jesus Padilla says:

I would have put some dynaliner behind that crossover bracket. Call me old school but I like using dynamat Xtreme and dynaliner combo.

Turmoilx says:

did you shoot this all in a couple days or you keep making this guy come back 20 times? lol or is it just boston jims car?

Gio arteaga says:

I like that smooth and placed

Harley Reinke says:

What material did you use for the vapor barrier?

Sinister says:

On the next 20 min. episode the installer takes a 15 min bathroom break…..

_1_ says:

Now this right here is what I call cut/copy and paste 🙂 awesome work on both doors sir…………………………….

Zpwslayer says:

Use a router to do the rounding instead of a jigsaw maybe?

Write a comment